Construction work taking place in Wakefield, England

Development Finance

Development Finance Explained: From Site Purchase to Completion

2 min readBy Christopher May

A development facility is different from a standard property mortgage because the lender is financing a moving project rather than a finished asset. The land, planning position, construction programme, professional team and projected end value all affect the funding structure.

Whether the scheme is a house conversion or a multimillion-pound development, the starting point is the same: does the project work after all costs, finance and realistic contingencies are included?

The lender's main measurements

Development lenders commonly consider the land or site value, the total project cost and the gross development value (GDV) expected on completion. You may see terms such as loan-to-cost (LTC) and loan-to-GDV (LTGDV). These percentages measure different things and cannot be swapped or added together.

A scheme with a strong projected GDV can still fail underwriting if build costs are understated, permissions are uncertain or the borrowing requirement leaves too little contingency.

How funds are usually released

A facility may include an initial amount for land acquisition or refinancing, followed by staged advances during the build. A monitoring surveyor or quantity surveyor may inspect the site and confirm progress before further funds are released. The timing and basis of each drawdown depend on the lender's documentation.

This can create a cash-flow gap if contractors need paying ahead of certification. Developers need an honest programme showing when bills fall due, what the lender will release and how any difference is funded.

What a strong application contains

Provide planning documentation, architectural drawings, a detailed build-cost schedule, a realistic timeline, project team details, evidence of experience, a sales or letting appraisal and a clearly supported exit. The lender may also ask for a cost-to-complete report, building warranty details and information about the proposed contractor.

The equity contribution is usually assessed across the full structure, including what the borrower has paid for the site, any existing security and available cash.

Repayment is part of the original plan

Some schemes exit through unit sales; others refinance into investment debt once completed and let. Lenders will stress-test these assumptions. Slower sales, cost overruns and weaker values can quickly change the risk profile.

Golden Trust Capital arranges specialist development finance for suitable business-purpose projects. If you have a site, programme and preliminary appraisal, share the outline with us for a case-specific assessment.

Discuss your transaction with our team

Send us the outline and we will come back to you promptly.

Golden Trust Capital

Registered address: 45 Albemarle Street, London, England, W1S 4JL

☎ +44 7976 703805

✉ chris@goldentrustcapital.co.uk

Property Finance Insights & Opportunities

Receive useful articles, specialist finance insights and occasional funding opportunities for property investors and developers.

Read our Privacy Policy to see how we handle your information.

We take your privacy seriously

Privacy Policy

Goldentrust Capital Limited (Company No. 15340675), trading as Golden Trust Capital, is a specialist property finance intermediary and not a lender. Golden Trust Capital is not authorised or regulated by the Financial Conduct Authority. We arrange commercial, investment and business-purpose property finance and do not arrange regulated residential mortgages, including regulated consumer buy-to-let.

All finance is subject to lender criteria, valuation, security, underwriting and applicable terms and fees. Funding levels are indicative and not guaranteed. Property offered as security may be repossessed if loan obligations are not met. Finance in European jurisdictions is subject to lender availability and applicable local requirements.